e-ISSN 2231-8526
ISSN 0128-7680
Muaadh Yahya Al-Kuhail, Hamoud Ahmed Al-Dafiry, Tarek Abdullah Barakat and Abdulwahad Al-Ansi
Pertanika Journal of Science & Technology, Volume 29, Issue 3, July 2021
DOI: https://doi.org/10.47836/pjst.29.3.23
Keywords: Diamond framework, ICTQS framework, project management, traditional triangle model, Yemen construction industry
Published on: 31 July 2021
The most prominent obstacle facing the construction industry in Yemen is mismanagement. Developing appropriate tools, approaches, and standards for managing construction projects will contribute effectively to the development and prosperity of the Yemeni construction industry. This study aims to provide the tools, approaches and standards for project management based on the opinions of the Yemeni advisory bodies. It presents an Integrated Cost, Quality, Time, and Scope (ICQTS) diamond framework model by developing the traditional triangle model in project management providing a practical contribution to researchers and companies working in the construction industry. The study uses a descriptive and analytical approach through a comprehensive literature review followed by a field study using a designed questionnaire distributed to the relevant Yemeni advisory bodies. The study concluded with the development of the traditional triangle model resulting in the introduction of the diamond framework model in the management of construction projects. Integration management was found to have a strong impact on project success presenting the framework model as an easy and flexible tool that unifies and integrates the processes and roles in the project and directing it towards achieving project stakeholder objectives. The literature largely neglects the impact of integration management in the various models and is mostly overlooked. Inclusion of integration management in the presented model will highlight measures of project success stressing the need to integrate and manage them together. Future studies may research the differences in the opinions of construction companies.
Alaghbari, W., Saadan, R. S., Alaswadi, W., & Sultan, B. (2018). Delay factors impacting construction projects in Sana’a-Yemen1. PM World Journal, 7(12), 1-28.
Alawi, N. A. M., & Masood, A. (2018). Environmental quality website disclosure in oil and gas sector: The case of MNCs in Yemen. Journal of Advanced Research in Business and Management Studies, 11(1), 10-23.
Alawi, N. A. M., Rahman, A. A., Amran, A., & Nejati, M. (2016). Does family group affiliation matter in CSR reporting? Evidence from Yemen. Afro-Asian Journal of Finance and Accounting, 6(1), 12-30. https://doi.org/10.1504/AAJFA.2016.074541
Al-Sabahi, M. H., Al-Hamidi, A. A., Ramly, A., & Rejab, K. M. (2014). Exploring criteria and critical factors for governmental projects implementation in Yemen: A case study.Journal of Surveying, Construction and Property, 5(2), 1 - 17. https: //doi.org/10.22452/jscp.vol5no2.2
Alwaly, K. A., & Alawi, N. A. (2020). Factors affecting the application of project management knowledge guide (PMBOK® GUIDE) in construction projects in Yemen. International Journal of Construction Engineering and Management, 9(3), 81-91. https://doi.org/10.5923/j.ijcem.20200903.01
Angarita, P., & Gallardo, R. (2018). Study of processes and procedures that affect the success of construction works by construction companies according to the guide to the project management body of knowledge (PMBOK Guide) in the municipality of Ocaña, Norte de Santander. In Journal of Physics: Conference Series (Vol. 1126, No. 1, p. 012052). IOP Publishing. https://doi.org/10.1088/1742-6596/1126/1/012052
Asif, M., Fisscher, O. A., de Bruijn, E. J., & Pagell, M. (2010). Integration of management systems: A methodology for operational excellence and strategic flexibility. Operations Management Research, 3(3-4), 146-160. https://doi.org/10.1007/s12063-010-0037-z
Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), 337-342. https://doi.org/10.1016/S0263-7863(98)00069-6
Barnes, M. (1988). Construction project management. International Journal of Project Management, 6(2), 69-79. https://doi.org/10.1016/0263-7863(88)90028-2
Barnes, M. (2007). Some origins of modern project management a personal history. Project Management World Journal, 2(11), 1-2.
Bennett, L. (2003). The management of construction – A project life cycle approach. Gower Publishing.
Berteaux, F., & Javernick-Will, A. (2015). Adaptation and integration for multinational project-based organizations. Journal of Management in Engineering, 31(6), Article 04015008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000366
Caccamese, A., & Bragantini, D. (2012). Beyond the iron triangle: Year zero. Project Management Institute.
Cao, Q., & Hoffman, J. J. (2011). A case study approach for developing a project performance evaluation system. International Journal of Project Management, 29(2), 155-164. https://doi.org/10.1016/j.ijproman.2010.02.010
Daher, K. (2018). Statistical analysis of geographical data using a computer. Islamic University of Gaza. Retrieved June 27, 2020, from http://site.iugaza.edu.ps/kabudaher/files/2017/10/%D9%83%D8%AA%D8%A7%D8%A8-%D8%AA%D8%AD%D9%84%D9%8A%D9%84-%D8%A7%D9%84%D8%A7%D8%AD%D8%B5%D8%A7%D8%A6%D9%8A.pdf
Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), 189-201.
Demirkesen, S., & Ozorhon, B. (2017). Impact of integration management on construction project management performance. International Journal of Project Management, 35(8), 1639-1654. https://doi.org/10.1016/j.ijproman. 2017.09.008
Devaux, S. A. (1999). Total project control: A manager’s guide to integrated project planning, measuring, and tracking. Wiley.
Dobson, M. S. (2004). The triple constraints in project management. Management Concepts Inc.
Ebbesen, J. B., & Hope, A. (2013). Re-imagining the iron triangle: Embedding sustainability into project constraints. PM World Journal, 2(3), 1-13.
Eisner, H., McMillan, R., Marciniak, J., & Pragluski, W. (1993). RCASSE: Rapid computer-aided system of systems (S2) engineering. In INCOSE International Symposium (Vol. 3, No. 1, pp. 267-273). Wiley. https://doi.org/10.1002/j.2334-5837. 1993. tb01588.x
Felician, A. (2011). Managing software development projects. Academy of Economic Studies.
Frame, J. D. (2002). The new project management: Tools for an age of rapid change, complexity, and other business realities (2nd Ed.). Jossey-Bass.
Gamil, Y., & Rahman, I. A. (2020). Assessment of critical factors contributing to construction failure in Yemen. International Journal of Construction Management, 20(5), 429-436. https://doi.org/10.1080/15623599.2018.1484866
Halfawy, M. M., & Froese, T. M. (2007). Component-based framework for implementing integrated architectural/engineering/construction project systems. Journal of Computing in Civil Engineering, 21(6), 441-452. https://doi.org/10.1061/(ASCE)0887-3801(2007)21:6(441)
Hamilton, A. (2001). Managing projects for success: A trilogy. Thomas Telford Publishing.
Heravi, G., & Ilbeigi, M. (2012). Development of a comprehensive model for construction project success evaluation by contractors. Engineering, Construction and Architectural Management, 19(5), 526-542. https://doi.org/10.1108/09699981211259603
Hogg, R., & Tannis, E. (2009). Probability and statistical inferences (8th Ed.). Prentice Hall.
Ika, L. A. (2009). Project success as a topic in project management journals. Project Management Journal, 40(4), 6-19. https://doi.org/10.1002/pmj.20137
Kermanshachi, S. (2016). Decision making and uncertainty analysis in success of construction projects (Doctoral dissertation). Texas A & M University, College Station, Texas. Retrieved January 15, 2020, from https://oaktrust.library.tamu.edu/handle/1969.1/158020
Likert, R. (1932). A technique for the measurement of attitudes. Archives of Psychology, 22(140), 1-55.
Lim, C. S., & Mohamed, M. Z. (1999). Criteria of project success: An exploratory re-examination. International Journal of Project Management, 17(4), 243-248. https://doi.org/10.1016/S0263-7863(98)00040-4
Lock, D. (2007). Project management (9th Ed.). Gower Publishing.
Major, I., Greenwood, A., Allen, D., & Goodman, M. (2003). The definitive guide to project management. Pearson Education.
Marasco, J. (2004, May 06). The project pyramid. Retrieved March 05, 2020, from https://www.ibm.com/developerworks/rational/library/4291.html
Ministry of Industry and Trade. (2020). Database of engineering consultancy agencies. Sana’a, Republic of Yemen.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: Linking project management performance and project success. International Journal of Project Management, 32(2), 202-217. https://doi.org/10.1016/j.ijproman.2013.05.012
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and technology (5th Ed.). Routledge.
Ong, H. Y., Wang, C., & Zainon, N. (2018). Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices. Journal of Construction Engineering and Management, 144(9), Article 04018079. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001533
Orr, A. D. (2007). Advanced project management: A complete guide to key processes, models and techniques (2nd Ed.). Kogan Page.
Ospina-Alvarado, A., Castro-Lacouture, D., & Roberts, J. S. (2016). Unified framework for construction project integration. Journal of Construction Engineering and Management, 142(7), Article 04016019. https://doi.org/10.1061/(ASCE) CO.1943-7862.0001131
Ozorhon, B., Abbott, C., & Aouad, G. (2014). Integration and leadership as enablers of innovation in construction: Case study. Journal of Management in Engineering, 30(2), 256-263. https://doi.org/10.1061/(ASCE) ME.1943-5479.0000204
PMBOK. (2017). A guide to the project management body of knowledge (6th Ed.). Project Management Institute.
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699-725. https://doi.org/10.1016/S0024-6301(01)00097-8
Shenhar, A. J., Levy, O., & Dvir, D. (1997). Mapping the dimensions of project success. Project Management Journal, 28(2), 5-13.
Silvius, A. G., Kampinga, M., Paniagua, S., & Mooi, H. (2017). Considering sustainability in project management decision making: An investigation using Q-methodology. International Journal of Project Management, 35(6), 1133-1150. https://doi.org/10.1016/j.ijproman. 2017.01.011
Tatum, C. B. (1990). Integration: Emerging management challenge. Journal of Management in Engineering, 6(1), 47-58. https://doi.org/10.1061/(ASCE) 9742-597X (1990)6:1(47)
Turner, R., & Simister, S. (Eds.) (2000). Gower handbook of project management (3rd Ed.). Gower Publishing.
Vahidi, R., & Greenwood, D. (2009). Triangles, tradeoffs and success: A critical examination of some traditional project management paradigms. Retrieved February 28, 2020, from https://www.researchgate.net/profile/Ramesh_Vahidi/publication/264540155_TRIANGLES_TRADEOFFS_AND_SUCCESS_A_CRITICAL_EXAMINATION_OF_SOME_TRADITIONAL_PROJECT_MANAGEMENT_PARADIGMS/links/53e34e9f0cf275a5fddad546.pdf
Wateridge, J. (1998). How can IS/IT projects be measured for success? International Journal of Project Management, 16(1), 59-63. https://doi.org/10.1016/S0263-7863(97)00022-7
Wells Jr, W. G. (1998). The changing nature of project management. Project Management Journal, 29(1), 4-4. https://doi.org/10.1177/875697289802900101
Westerveld, E. (2003). The project excellence model®: Linking success criteria and critical success factors. International Journal of project management, 21(6), 411-418. https://doi.org/10.1016/S0263-7863(02)00112-6
White, D., & Fortune, J. (2002). Current practice in project management—An empirical study. International Journal of Project Management, 20(1), 1-11. https://doi.org/10.1016/S0263-7863(00)00029-6
Wideman, M. (2004). An exciting new model of project management. Retrieved February 13, 2020, from http://www.maxwideman.com/musings/newpmmodel.htm.
Williams, T. (2002). Modelling complex projects. John Wiley & Sons.
Winter, M., Smith, C., Cooke-Davies, T., & Cicmil, S. (2006). The importance of ‘process’ in rethinking project management: The story of a UK government-funded research network. International Journal of Project Management, 24(8), 650-662. https://doi.org/10.1016/j.ijproman.2006.08.008
Wyngaard, C. J., Pretorius, J. H. C., & Pretorius, L. (2012). Theory of the triple constraint—A conceptual review. In 2012 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 1991-1997). IEEE Conference Publication. https://doi.org/10.1109/IEEM.2012.6838095
ISSN 0128-7680
e-ISSN 2231-8526